FAO C.D.M. Manager Date......... REF...........

  1. PMS Electrical Services Ltd will arrive on site on the date and time agreed with the main contractor
  2. The time allowed on site is around 1 week for the complete installation plus additional days for the extras
  3. We will install a temporary distribution board which is RCD monitored for the temporaries to the site if required
  4. All the works carried out above ground level will be on wooden step ladders
  5. Hard hats will be worn by our operatives at all times
  6. All electrical fixing equipment will be of a 110 volt type ran through a transformer
  7. All unwanted electrical equipment will be taken from the site and deposited in a skip provided by
  8. All electrical equipment delivered to site will be placed at a location designated by
  9. All electrical works carried out on site will be to the I.E.E. Wiring Regulations specification as confirmed by
  10. The Health and Safety Requirements on site will be to the I.E.E. Wiring Regulations specification as confirmed by

MANAGEMENT

The monitoring of our Health and Safety will be carried out by Mr. P. B. Witham.

We trust this method statement meets your requirements within your own Health and Safety plan but should any further information be required please do not hesitate to contact me.

Yours Faithfully

PMS ELECTRICAL SERVICES LTD